Yangon Factory (Main Factory)

  • Established: 7th November,2001
  • Workers: 500
  • Production Capacity: 1.5 MT/Hr
  • Contact Plate freezer: 0.5 MT/Batch x 3 Nos. / 0.75 MT/Batch x 1 Nos. (2 in 1)
  • Flake Ice: 10 MT/Day
  • Cold Storage: 100 MT x 1 Nos. / 150 MT x 1 Nos.

Water Treadment System